Discover the Project Vision of Sierra Bible Camp

April 7, 2019
UPDATE the Bunkhouse is finished, by God Blessings!!
Dear Brothers and Sisters in Christ,

As many of you know, Sierra Bible Camp has been impacting lives for Christ since 1955, and Lord willing, it will continue for generations to come. The Board was blessed last year (2018) to receive two large monetary donations totaling $125,000. The intent of one of donors was that a new building be built to provide additional family sleeping quarters. With much prayer and faith, a new Family Bunkhouse (which will accommodate up to 36 people, small kitchen area, and two bathrooms with tubs) is over 60% complete! We also have started building a new maintenance building in which the dirt pad is completed at this time.

The Board knew that a campaign to raise funds to complete these buildings would be necessary. We put our faith in God that we will be able to complete the buildings. This is the first "new" building project for SBC in 3 7 years - the last being the canteen.

Approximately $95,000 is needed to complete the bunkhouse and shop building and it is the desire of the Board that they both be completed and ready for use in 2019, God willing. We are requesting that each congregation that uses Sierra Bible Camp ask for a special contribution to aid in meeting that goal.

Enclosed are pictures of the bunkhouse, floor plans, and budget list of items to be completed on the project. There is GoFundMe account link at web site www.sbcamp.com and a link containing all these documents for digital presentation.

Enclosed are envelopes for mailing in donations and a GoFundMe account has been set up for online donations at http ://www .gofundrue.com/sierra-bible-camp-bLmkhou e Please feel free to copy and share this information with any other congregations or individuals that may like to join in this mission. Please know that all funds donated will go luwanls cumpleliun of lhe new buildings; any remaining funds will be used for future SBC projects.

Even if your church does not use Sierra Bible Camp, maybe someone in your church attended camp as a camper or staff in the past. Please pass this information along so we can spread the word of our need. SBC is one the greatest baptismal missions for young people on the West Coast.

Thank you for prayerful consideration of this request and your support of Sierra Bible Camp.

In His Service,

The SBC Board

Untitled-3
Untitled-3

Family Bunkhouse Remaining Items

sinks 4 250 $1,000
Toilets 4 $180 $720
Faucets 4 $100 $400
Bathroom stalls panels 3 $500 $1500
Mop Sink 1 $180 $180
Mop sink water valve 1 $250 $250
Electrical panel 1 $300 $300
Paint Inside 1 $800 $800
Misc. 1 $2,000 $2,000
lights 30 $100 $3,000
Swamp cooler 1 $650 $650
Internal finish materials 1 $3,500 $3,500
Drywall with labor 1 $8,500 $8,500
Bathroom ADA Bars 6 $80 $480
Bedding and bunks 12 $1,300 $15,600
Electrical 1 $3,500 $3,500
Insulation 1 $10,000 $10,000
Bathroom heater/fan unit 2 $400 $800
Kitchen cabinets 1 4,300 $4,300
Refrigerator 1 $900 $900
Range/oven 1 $1,400 $1,400
Range Hood 0 $300 0
Microwave 1 $300 $300
Wainscot and molding 1 2,500 $2,500
Track Curtains 6 250 $1,500
Fire Sprinklers 1 2800 $2,800
Finish plumbing 1 3500 $3,500
$70,380
Shop items
Slab 1 13,000 $13,000
Framing Materials 1 6,500 $6,500
Roof 1 3,500 $3,500
Roll up door 1 2,000 $2,000
$25,000
Total $95,380

Completed Projects

Resurface Baseball Field $3,000 Fall - 07
Replacing beds and mattress in the Kitchen/Staff Area $350 per bed Summer - 06
2 trees removed from girls cabin area Spring - 06
Build 7 RV hookups (water and power) upgrade electrical panel $1,500 Spring - 06
Rebuild 1/3 of girl's cabin 3 $20,000 Spring - 06
Pad under Clothesline $350 Fall - 05
Build french-drain to remove water from the Dining Hall $700 Spring - 05
Removal of dead pines (Forest Service Requirement)/ rebuild Kitchen Porch $1,350 Spring - 05
Two new cement picnic tables - special donation $1,100 Spring - 05
New stage for campfire $4,300 Spring - 05
Replacement of Kitchen Floor $11,500 Spring -04
Replacement of Kitchen Equipment $7,500 Spring - 04
Finish re-roofing main building $6,000 Spring - 04
Rebuilding of girls cabin 5 $8,400 Spring - 03
Waterline from Spring to Ball Field (2.5 m ppt) $8,500 Fall - 03
Re-plumbing girls and boys sinks/ Trailer Station/ Nurse's leach line (9.9 m ppt) $1,500 Fall - 02
Replacement of leach field with in field behind girls cabin area $34,000 2000
15 cabins re-roofed (15 year period) $16,000 1990 - 2005
Canteen-log-cabin $22,000 1990 - 1991
Pool rebuilt $24,000 2009
Dining Hall floor painted $2,300 2009
Pool fence painted $400 2009
New hot water heater pool house $3,800 2009
Septic tanks cleaned and pumped $3,800 2009
3 new toilets installed, start of replacement of all $470 2009
Privacy screens installed in boys bathroom $500 2009
Stumps grounded out $650 2009
Brush cleared from behind main lodge Priceless 2009
Water line replaced behind lodge $300 2009
New benches installed in church bowl $100 2009
Nusre bathroom remodeled $6,500 2010
New toilets pool house/girls bathroom $470 2010
New lights PGE program $625 2010